ENGINEERING AND LOCAL FABRICATION
Steel structures and fabrication in Tierra del Fuego
With offices in Ushuaia and Río Grande, we mobilise to project sites throughout Tierra del Fuego.
At Costa Sur, we provide structural engineering and local steel fabrication across Tierra del Fuego. Our scope ranges from analysis and modelling to shop drawings and the documentation needed for fabrication and site erection.
We combine construction experience with structural design, considering geometry, load-bearing members and connections alongside fabrication and erection requirements.
From structural analysis to construction details
We design and check steel structures for the project loads and conditions. We develop portal frames, beams, columns, purlins, bracing and connections, coordinating interfaces with foundations, the building envelope and services.
Structural analysis and design checks.
Modelling of the structure and its components.
Connection and interface detailing.
Shop drawings and erection drawings.
Quantity take-offs and material lists.
Tekla Structures and local fabrication
We use Tekla Structures to model structural members and connections. The model provides the basis for drawings and material lists that link structural design with fabrication.
Local fabrication supports the requirements of projects throughout Tierra del Fuego. Each commission has an agreed scope covering engineering, documentation, fabrication or site involvement, as required by the project.
Fabrication and erection experience
Explore the range of projects undertaken by Costa Sur in our Projects section.
Let's discuss your structure
For a project anywhere in Tierra del Fuego, tell us the structure’s intended use, location, dimensions and design stage. We can develop a proposal from a preliminary design, existing drawings or a brief for fabrication documentation.
Enquire about engineering and fabrication or email costasursa@gmail.com.
Steel structures on site
Photographs of fabrication and erection work. See further examples in our Projects section.
Gimnasio Luis Garibaldi




Alero del Laboratorio Fin del Mundo: structural visualisation and footage of fabrication and erection.